rb3111-3b.jpg (33986 bytes)ORIGINAL PILE INSTALLATION

Original piles being installed for Saskatchewan Legislative Building. Crews utilize steam powered pile driver to install piles to a depth of 3 metres (14 feet).  New pre-cast contrete piles will be installed to a minimum depth of 10 metres (30 feet).