ORIGINAL PILE INSTALLATION
Original piles being installed for Saskatchewan Legislative Building. Crews utilize steam powered pile driver to install piles to a depth of 3 metres (14 feet). New pre-cast contrete piles will be installed to a minimum depth of 10 metres (30 feet).